Skip to content
FrameOak

In the order of work

The six jobs

Water first, then the ground, the roof, the openings, the walls and the garage. Each guide says what the work is, what drives the price and what to ask before you sign.

01 · Water and drainage

Where the water goes decides what everything below and above it has to survive.

02 · Foundation

The ground under the house: what moves, how it is lifted or supported, and when a crack matters.

03 · Roof

The lid: replacement, repair, materials and the parts under the shingles.

04 · Windows and doors

The holes in the wall: ratings, fit and flashing.

05 · Siding and insulation

The skin: cladding, wrap, insulation and what hides behind them.

06 · Garage

The big add-on: building one, replacing its door, repairing its slab and frame.