A new door is only as good as the frame, sill and flashing it sits in. Pick the door by its rated numbers, then check how the opening is prepared.
By FrameOak Editorial Team Updated 7 min read
- What it fixes
- Drafts, rot, worn doors
- What drives the price
- Type, glass, frame rot
- Permit
- Confirm locally
- Federal credit (25C)
- Ended Dec. 31, 2025
In short
A replacement door is chosen on its material, glass and NFRC-rated U-factor and SHGC, and installed in an opening that is flashed, sealed and checked for rot. DOE says the R-values of most steel and fiberglass-clad entry doors range from R-5 to R-6, excluding a window, and that insulated steel and fiberglass doors are more energy-efficient than wood. ENERGY STAR Version 7.0 limits an opaque door to a U-factor of 0.17. The federal credit for doors ended for work placed in service after December 31, 2025. FrameOak does not sell or install doors.
Choosing the door: steel, fiberglass or wood
DOE says that although many people choose wood doors for their beauty, insulated steel and fiberglass doors are more energy-efficient. It puts the R-values of most steel and fiberglass-clad entry doors at R-5 to R-6, excluding a window, and says a foam-core steel door gives far more insulation than a solid wood door of the same size. Steel doors with a polyurethane foam core often need no added weatherstripping if installed correctly, because they include a magnetic strip.
Glass changes the picture. DOE says single-pane glass or patio doors, especially sliding glass doors, lose much more heat than other types of doors, and recommends multiple glass layers, low-e coatings or low-conductivity gas fills. Swinging doors seal more tightly than sliding doors, and a door with one fixed panel leaks less air than one with two operating panels. Wood doors suit some houses, so plan for the finishing they need (see below).
Reading the label and ENERGY STAR limits
Doors carry the same NFRC label as windows, showing U-factor and SHGC for a specific glass configuration. The NFRC page lists a door U-factor range of 0.00 to 2.00. DOE says to look for a low U-factor, and a low SHGC where cooling dominates or a high SHGC where heating dominates. ENERGY STAR's Version 7.0 specification, effective October 23, 2023, sets these limits for doors:
| Door type | U-factor | SHGC |
|---|---|---|
| Opaque (no glass) | 0.17 or lower | No rating |
| Up to half glass | 0.23 or lower | 0.23 or lower |
| More than half glass, Northern and North-Central zones | 0.26 or lower | 0.40 or lower |
| More than half glass, South-Central and Southern zones | 0.28 or lower | 0.23 or lower |
A worked example: a door that is more than half glass, labeled U-factor 0.27 and SHGC 0.23, is over the 0.26 U-factor limit in the Northern and North-Central zones, so it does not meet them. In the South-Central and Southern zones it is under the 0.28 U-factor limit and at the 0.23 SHGC limit, so it meets them. Find your zone on energystar.gov. See replacement windows and ratings for how the label is read.
What a sound installation includes
The door maker's instructions govern. Pella's full-frame replacement instructions for block-frame entry doors show the shape of a careful job. The old door and frame come out, the opening is cleaned, and its size is measured. The new door should be 1/2 inch to 3/4 inch narrower and 3/8 inch to 1/2 inch shorter than the opening, which for an opening 38 inches wide and 82 inches high means a door 37 1/4 to 37 1/2 inches wide and 81 1/2 to 81 5/8 inches high. The opening must be plumb, level and square.
The sill then gets flashing tape, and the instructions say the flashing must slope to the exterior. An optional sill pan goes under the threshold. Sealant is applied under and around the unit, the door is shimmed and screwed into the studs, and low-pressure, low-expansion polyurethane foam goes in the gap. The instructions say not to use high-pressure or latex foam, and not to raise the threshold more than 1/4 inch. The weatherstrip seal is checked with a dollar bill test, and the exterior joint is sealed over a backer rod.
DOE's door page agrees on two points. A pre-hung door's frame must be as square as possible so that the door seals tightly and swings properly, and expanding foam should be applied carefully so that it does not push a wood frame out of square. Door installation is skilled carpentry, and Pella's instructions call for at least two people to handle the door. Hire a contractor.
Rot, permits and older houses
The Pella instructions have no step for checking the subfloor or sill for rot, so ask the contractor to look when the old door is out and to say in writing what they will do if they find it. Wet, soft wood under a threshold is a carpentry repair that changes the price. Settle how it is priced before work starts; see contracts and change orders.
Some places require a permit to replace an entry door and some do not. Confirm with your local building department, and ask what applies to a door between the house and an attached garage. If the opening will be widened, that is structural work for a licensed contractor and, where a header changes, a structural engineer. If the house was built before 1978, ask about lead-safe work: EPA says anyone paid to perform work that disturbs paint in pre-1978 housing must be certified, including sole proprietors, and Pella's instructions warn that older doors may have lead-based paint.
Storm doors, finishing and the warranty
DOE says a storm door can be a good investment when the existing door is old but in good condition, and that adding one to a newer insulated door usually is not worth the cost. It also warns that glass storm doors can overheat the entry door in strong sun, so check the manufacturer's recommendations.
Finish matters for wood and some other doors. Pella's instructions say to finish immediately or cover the door, and to paint within 45 days of installation to maintain the warranty. Ask the installer who finishes the door and by when, and read the finish clause in the warranty. See warranties: what they cover.
What to put in writing
- The door make, model, material and glass, and its NFRC U-factor and SHGC.
- Pre-hung unit or slab only, and whether the frame, sill and threshold are replaced.
- How the sill is flashed, and whether a sill pan is used.
- What happens if rot is found under the threshold, with a price per repair.
- The foam and sealant used, and the threshold height.
- Who finishes or paints the door, and by what date.
- Who pulls the permit, and the lead-safe work plan if the house is older.
Run your numbers in the cost estimator for planning ranges, and use check a bid to see whether a bid names each part. The federal 25C credit that covered doors ended for property placed in service after December 31, 2025, and state or utility rebates vary, so ask before you order. You can request bids from contractors who work in your area.
Sources
- U.S. Department of Energy — Doors
- ENERGY STAR — Residential Windows, Doors, and Skylights Version 7.0 specification
- NFRC — Window and door label ratings
- Pella — Full frame replacement block frame entry door installation instructions (© 2021)
- EPA — Renovation, Repair and Painting Program
Facts on this page were last checked November 20, 2026. The Pella booklet shows only a 2021 copyright and no revision date, and covers one maker's block-frame doors; other makers and door types differ, so the door maker's own instructions govern. The DOE door page shows no date. The 25C ending date is from the IRS. The door size example is an invented illustration using Pella's stated clearances. FrameOak does not sell or install doors.
Questions homeowners ask
Which is better, a steel or fiberglass door?
DOE says insulated steel and fiberglass doors are more energy-efficient than wood. Beyond that, compare the NFRC ratings, the warranty and the installer for your exact doors.
What U-factor should my new door have?
ENERGY STAR Version 7.0 allows 0.17 for an opaque door and 0.23 to 0.28 for doors with glass, depending on how much glass and your climate zone. Lower is better insulation.
Do I need a permit to replace a front door?
Some places do and some do not. Confirm with your local building department, especially for a door to an attached garage or if the opening size will change.
Is there a tax credit for a new door?
Not for work placed in service after December 31, 2025. The federal 25C credit ended on that date. State and utility programs vary.
Get bids on this job
Describe the job in two short steps. FrameOak passes it to home improvement contractors and installers who work in your area; they set their own prices and terms and you decide whether to go ahead.
- 01 About the job.
- 02 Your contact details and consent.
- 03 A home improvement contractor or installer contacts you. Nothing is decided until you agree.
FrameOak is not paid by you. The home improvement contractors and installers who contact you set their own prices and terms. How we make money.
Next on the list
-
Job
Replacement windows and ratings
How to read an NFRC label, what ENERGY STAR zone limits mean, and what to put in a window bid.
-
Job
Window installation and flashing
The order of sill, jamb and head flashing, what goes in the gap, and what to ask an installer to put in writing.
-
Guide
Warranties and what they cover
Manufacturer versus workmanship warranties: what they usually cover, exclude and how transfer works.