What to fix first
Tick what you have noticed. You get the six jobs in an order that does not undo itself, with the reason for each step.
Your order of work
no signs tickedA planning aid, not an inspection. Movement in the structure needs an engineer, whatever the order says.
Get bids for the first job
Describe the job in two short steps. FrameOak passes it to home improvement contractors and installers who work in your area; they set their own prices and terms and you decide whether to go ahead.
- 01 About the job.
- 02 Your contact details and consent.
- 03 A home improvement contractor or installer contacts you. Nothing is decided until you agree.
FrameOak is not paid by you. The home improvement contractors and installers who contact you set their own prices and terms. How we make money.
The logic behind the order
The default order follows how water moves and how a house is built: lead the water away, secure the ground, close the roof, fit the windows and doors, wrap the walls, and leave the garage for last because it mostly stands apart. Three rules change it, and each is shown with its reason: an active roof leak moves the roof to the front, flagged drainage stays ahead of a flagged foundation, and windows and siding that are both flagged are planned as one job.
What it is not
It does not diagnose. Stair-step cracks, doors that stick and floors that slope can have several causes, and only an inspection tells them apart. If the foundation is flagged, the first step is a structural engineer's report, before anyone prices a repair.