Questions and answers

Short answers to what homeowners ask before foundation, roof, window, siding, garage and drainage work. Each one links to the page with the details.

About FrameOak and the estimator

Is FrameOak a contractor, engineer, inspector, lender or insurer?

No. FrameOak is an independent educational site and does not do the work, inspect, lend or insure. See about and the disclaimer.

Is the cost estimator a bid?

No. The estimator gives planning ranges, not bids. The price of your job depends on your house, the scope and the contractor. It is free to use. Try cost by ZIP; the methodology page explains how the ranges are built.

Who are the contractors in the bid request form?

They are home improvement contractors and installers who work in your area and have agreed to receive requests. They are partners, and each pays FrameOak for each request it receives. FrameOak does not rank them or say which one is best. See get bids and how we make money.

Does the money from partners change what FrameOak writes?

No contractor can pay to appear in an article or change what one says, and the estimator is not adjusted for any partner. The editorial policy sets out the rules.

What is The Plumb Line?

It is a short email about changes in costs and rules. Reading the site and subscribing cost nothing. See The Plumb Line.

Bids and money

How do I compare bids?

Get more than one, all written to the same scope, and compare line by line instead of by the bottom number. See comparing contractor bids and check a bid.

How big should the deposit be?

It varies by state and job, and some states limit deposits. Prefer a small deposit and payments tied to finished stages, with lien waivers at each payment. See lien waivers and payment schedule.

What happens if the price changes during the job?

Any change to the scope or price should go into a change order signed by both of you before the extra work starts. See contracts and change orders.

Can I cancel after I sign?

If you signed at your home or away from the contractor's permanent place of business, the FTC Cooling-Off Rule may give you three business days to cancel. It has exceptions, such as emergencies, and state law may add rights. See contractor scams after storms.

How are major home projects financed?

Common routes include savings, a home equity loan or line, and a loan arranged through the contractor. Compare the total cost and read the terms away from the sales table. See financing major home work.

Foundation and drainage

Do I need an engineer before I get foundation repair bids?

For anything more than a cosmetic crack, an engineer's report first is a sound step. It should come from a structural engineer who is not paid by a repair company, and it gives every bidder the same problem to price. See foundation repair methods.

Is every foundation crack serious?

No. Many are cosmetic, and the width, direction and pattern of a crack, and whether it is changing, matter more than the crack itself. Have an engineer look at cracks that widen, run diagonally from corners or come with sticking doors. See foundation cracks: what matters.

What is the difference between a slab and pier and beam?

A slab-on-grade foundation is a concrete slab at ground level with no crawl space. Pier and beam holds a raised floor on beams over a crawl space. Each moves and is repaired in its own way. See slab vs. pier and beam.

Will a French drain keep water away from my foundation?

Only if the water is shallow groundwater or surface runoff that the drain can intercept. Gutters, downspout extensions and grading usually come first. See French drains and yard drainage and gutters and downspouts.

What is the difference between waterproofing and foundation repair?

Waterproofing deals with water getting in or pressing on the foundation. Repair deals with a foundation that has moved. Wet soil and moving soil are often linked, so ask whether the evaluation covers both. See foundation waterproofing.

Permits and paperwork

Do I need a permit?

In most places structural repair, a new garage and most roof replacements need one, and rules for windows, doors and siding vary. Confirm with your local building department before work starts. See building permits for major work.

Does my contractor need a license?

Many states license contractors. Texas has no state license for general contractors, though some trades and cities have their own rules. Check your state board and the licensing page. See contractor licensing and insurance.

What is a certificate of insurance, and why ask for one?

It is a document from the contractor's insurer or agent showing coverage and policy dates. Ask for it before work starts, and have it come from the insurer or agent. See contractor licensing and insurance.

What is a lien waiver?

It is a signed statement from a contractor, subcontractor or supplier that they give up the right to file a lien for the amount paid. Ask for one with each payment. Rules vary by state. See lien waivers and payment schedule.

Roof and exterior

Should I repair or replace my roof?

It depends on the roof's age, how widespread the damage is, how many layers are on it and the condition of the decking. Written findings and photos of the problem areas help you compare options. See roof repair or replace.

What is a roofing square?

A square is 100 square feet of roof surface, and roofing bids are often priced per square. Ask how many squares the contractor measured and how slope is counted. See roof replacement, step by step and the glossary.

What do U-factor and SHGC mean on a window label?

U-factor is how fast heat passes through the window; lower means less heat loss. SHGC is how much of the sun's heat gets through; lower blocks more. Compare NFRC-labeled numbers for your climate. See replacement windows and ratings.

Is there still a federal tax credit for windows, doors or insulation?

Not for work done in 2026. The federal Energy Efficient Home Improvement Credit ended for property placed in service after December 31, 2025. State and utility rebates vary, so check them yourself and never assume one. This is not tax advice. See replacement windows and ratings.

Does new siding need house wrap and flashing?

Siding sheds most water, but the water barrier and flashing behind it handle what gets past. Ask what will be installed or replaced and who checks it before the siding covers it. See siding replacement process and exterior insulation and house wrap.

Scope and order of work

Which job should I do first?

The usual rule is to stop water and ground movement before finishing work: gutters and drainage, then the foundation, with an active roof leak handled right away. An engineer or inspector can tell you if your house needs a different order. See fix first.

Can windows, siding and wall insulation be done together?

Often, and it can make sense because window flashing, house wrap and siding meet at the same joints. Ask who is responsible for each layer. See window installation and flashing and exterior insulation and house wrap.

What should a scope of work include?

Materials by name, measurements, what is removed and hauled away, what is left out, the permit, cleanup and how surprises such as rotted decking are handled. See scope of work, line by line.

How long will the work take?

It depends on the job, the weather, permit and inspection timing and material lead times, so no single number fits. Ask each contractor for a start window and a finish window in the contract. See contracts and change orders.