How the estimates work
Every number on the estimator comes from a named source or from arithmetic shown here. The results are planning ranges for a conversation with a contractor, not bids.
Last updated
What the estimator is
The cost-by-ZIP estimator turns the lines of work you tick and the quantities you enter into a range, in dollars, for each line and for the total. The bid checker compares one line of a bid with the same range. Neither one sees your house, so neither is a quote, an inspection or an engineer’s opinion.
Where the per-unit ranges come from
Each line of work (a pier, a roofing square, a window, a square foot of siding) has a national range per unit. The ranges come from published cost guides from commercial publishers such as Angi, HomeGuide, Fixr and Bob Vila. These are market data built from contractor and homeowner reports, not government statistics. The exact pages, and the date each was read, are listed under the estimator (“Where the per-unit ranges come from”). We read them on November 20, 2026. Many of the pages show no date themselves.
For a line, the range we use is the middle of what the guides state: the median of their low figures and the median of their high figures. Three adjustments are stated openly:
- A guide that prices a different thing (a different material, a unit that does not match, an old or derived figure) is left out of that line, and the research notes say why.
- Where a guide gives a price per square foot and the line is per roofing square, we multiply by 100 (a square is 100 square feet).
- A few lines rest on fewer than three guides or on a judgment where the guides spread too wide to use as they are. Those are marked in the research file (
research/cost-research.jsonin the site’s source). A line no guide prices on a stated unit is left out rather than guessed: exterior foundation waterproofing and continuous exterior insulation are not in the estimator for that reason.
The regional adjustment
Prices differ by place, mostly through labor. We assume half of an installed price is labor and half is materials, materials priced the same everywhere. The labor half is moved by how a state’s carpenters are paid compared with the whole country: the state mean hourly wage divided by the US mean hourly wage, from the Bureau of Labor Statistics’ Occupational Employment and Wage Statistics for carpenters (47-2031). The release we could read in full for every state is May 2023, so that is the one used; the ratio between a state and the country shifts slowly and is refreshed when a newer release is read.
The multiplier on a national range is therefore 1 + 0.5 × (state wage ÷ US wage − 1). A state whose carpenters earn 20% more than the national mean moves a price by 10%. The 50% labor share is our assumption, not a published figure; it differs by job.
A ZIP code is used only to find the state, from its first three digits (USPS ZIP3 assignments). A ZIP that does not map to a state gets the US average and the page says so. The calculations run in your browser and the estimator does not save what you enter. The ZIP code and job you pick on the home page travel in the page address, as with any web form, and your entries reach FrameOak’s inbox only if you send a bid request.
Rounding and what is left out
Results are rounded to the nearest $10 under $1,000, $50 under $10,000 and $100 above, because a precise-looking figure would claim more than the data knows. The range excludes permits and design fees, engineering reports, demolition and disposal beyond the usual, access problems, hidden rot or soil movement, and the contractor’s own margin and schedule.
The bid checker
You enter one line, its quantity, the ZIP code and the price. The tool computes the same range and says where the price sits: below the low end, inside the range, above the high end by up to half again, or more than half again above. Those labels are a conversation starter. A price below the range often means a line is missing from the scope; a price above it often means something the other bidders did not include. The questions it suggests are general and the same for any contractor.
Rain runoff
One inch of rain on one square foot is 144 cubic inches, which is 0.623 US gallons (a gallon is 231 cubic inches). Gallons from a storm are the roof’s footprint in square feet times the inches of rain times 0.623. Peak flow in gallons per minute is the footprint times the rainfall rate in inches per hour, divided by 96.3, and is split evenly across the downspouts you enter. The tool takes the rainfall you give it and does not look up local rainfall or size gutters.
What to fix first
The planner puts the six jobs in the order of work: drainage, foundation, roof, windows and doors, siding and insulation, garage. Three rules reorder them, each shown with its reason: an active roof leak moves the roof first; flagged drainage stays ahead of a flagged foundation, because a house lifted while the water that moved it keeps arriving can move again; and windows and siding that are both flagged are planned as one job. It is a planning aid built from the editorial team’s reading of the guides on this site, not an inspection. Signs of structural movement need a structural engineer.
How articles are researched
Articles cite government agencies, model codes and standards bodies, and manufacturers’ installation instructions, and say when they were last checked. Cost figures in articles are described in words or point to the estimator; they are not hard-coded. The editorial policy explains corrections; to report a mistake, use the contact page.