Siding types compared: what each material asks of the installer and of you

The material you pick sets how the wall is fastened, sealed and maintained. Compare the rules that come with each one before you compare bids.

By FrameOak Editorial Team Updated 7 min read

Priced by
Square (100 sq ft of wall)
What drives the price
Material and wall area
Permit
Varies; ask locally
Who to hire
Check state licensing
Illustration: four wall samples side by side showing vinyl, fiber cement, wood and metal siding

In short

Siding is the outer layer of the wall, and each common material has its own installation rules. Vinyl must be fastened so it can move. Fiber cement needs set clearances at roofs and paths, sealed cut edges and dust control. Wood needs priming and a way to dry. Compare those rules, not only the look, and ask for the material's current installation instructions in your contract. Run planning ranges in the cost estimator.

What siding is, and how it is priced

Siding, also called cladding, is the outer layer that sheds rain and sun. It is not the whole weather defense. The Building America Solution Center, a U.S. Department of Energy resource, describes a sealed, continuous drainage plane behind the cladding that drains water that gets past it, and it favors that approach over a "barrier wall" that relies on caulk to stop all water. That layer is covered in exterior insulation and house wrap.

Contractors usually measure siding by wall area. Many suppliers quote it by the square, which is 100 square feet of wall. As an invented example, take two walls of 40 by 9 feet and two of 28 by 9 feet. That is 720 plus 504, or 1,224 square feet. Subtract 10 windows at 15 square feet and 2 doors at 21 square feet, which is 192 square feet, and 1,032 square feet remain, or 10.32 squares. Gable ends, trim and waste come on top, so ask how the bid counts them.

The price moves with the material, the wall area, the number of stories, how many corners, windows and trim details the wall has, what the crew finds under the old siding, and the local labor market. FrameOak gives no price table. Run your own numbers in the cost estimator, which gives planning ranges, not bids.

Four common materials

Vinyl

Plastic panels that hang from nails and must be free to move as temperatures change. The Vinyl Siding Institute's quick tips say to leave about 1/32 inch under each nail head and not to drive nails tight. The panels come finished, so they are not painted on site.

Fiber cement

A cement-based board sold as lap planks, panels and shingles. Installation rules cover clearances, sealed cut edges, paint type and dust from cutting. It is heavier than vinyl, and boards are handled and cut with care.

Wood and engineered wood

Cedar, pine and wood-fiber products. They take paint or stain well and can be repaired in place. They need a finish and a way to dry, and the U.S. Forest Products Laboratory ties paint life to how soon the wood is primed.

Metal

Aluminum or steel panels, factory finished. They shed water. They can dent, and the finish warranty terms matter, so get them in writing.

What each material asks of the installer

These are examples from the manufacturers' and agencies' own pages. They are not a full list, and the instructions that came with your product control.

Examples of installation rules by material, from the cited sources
MaterialA rule to ask aboutWhere it comes from
VinylAbout 1/32 inch under each nail head. 1/4 inch of room in trim channels, 3/8 inch when installing below 40°F. Fasteners reaching the framing by at least 1 1/4 inches in total.Vinyl Siding Institute quick tips (2020)
Fiber cement1 to 2 inches of clearance above roofing and paths; grade clearance is left to local code. Seal cut edges. 100% acrylic topcoats are recommended.James Hardie lap siding requirements, Florida-approved copy dated 10/10 (check the current edition)
WoodPrime before the wood sits in the sun. A vented airspace behind the siding on furring strips helps it dry.USDA Forest Products Laboratory, revised 2013
MetalFollow the manufacturer's sheet. This page opened no metal-siding source and gives no numbers for it.Manufacturer's instructions

Paint, finish and upkeep

Upkeep differs more than the look does. Vinyl and factory-finished metal are not painted on site. Fiber cement needs paint that suits it. The Hardie page says not to use stain or oil or alkyd paints and to repaint within set times if the board was sold primed only. Wood needs the most care.

The Forest Products Laboratory reports one test in which wood painted and primed before any sun exposure went at least 30 years before repainting. Wood left in the sun for one week before priming needed repainting at 13 years, and two weeks at 10 years. That is one test of one system, not a promise for your house, but it shows why the order of work matters. Ask the contractor when each coat goes on.

The wall behind the siding

A new material does not fix a wet wall. The Department of Energy's re-siding checklist begins by inspecting the walls for bulk water intrusion and for moisture or pest damage, and it has the contractor give the homeowner a list of problems before work starts so repairs can be handled within the project. Ask for that list in writing, and ask how rotted sheathing will be priced if it turns up once the old siding is off. Changes like that belong in a change order, covered in contracts and change orders.

What to put in writing

  • Which product line, profile and color, and where is the manufacturer's current installation sheet?
  • How do you count the wall area, gables, trim and waste in the price?
  • What goes behind the siding, and who inspects it before it is covered?
  • How are cut edges sealed, and what paint or finish goes on, and when?
  • What clearance will you leave to grade, roofs and paths, and what happens at the ground if the soil is high?
  • Who pulls the permit, and do you carry the license and insurance my state requires?
  • What does the manufacturer's warranty cover, and does the contractor's work have its own written terms?

Use the answers to compare bids line by line. See comparing contractor bids and the bid check. The order of work is in the siding replacement process.

Sources

Facts on this page were last checked on November 20, 2026. The James Hardie document is a 2010 Florida-approved copy, so check the current instructions for your product. The Vinyl Siding Institute page carries a 2020 copyright and the Forest Products Laboratory page is dated July 2013. The wall dimensions in the example are invented to show the arithmetic. The short descriptions of metal siding and of wood-fiber products are general, not taken from a source page. FrameOak does not sell or install siding.

Questions homeowners ask

Which siding is the right one for my house?

This page does not rank materials. Climate, budget, the look you want and the upkeep you will do all change the answer. Compare each material's installation rules and warranty terms, and ask each contractor what they install most often and why.

Do I need a permit to replace siding?

It depends on where you live. The Minnesota Department of Labor and Industry says building permits are required for re-siding there. Rules differ by city and state, so confirm with your local building department.

Can I put new siding over the old?

Sometimes, but it hides what is behind. The Department of Energy's checklist for adding insulation when re-siding starts with removing the old cladding and checking the walls for moisture or pest damage. Ask the contractor what they will inspect and who decides.

Does FrameOak install siding?

No. FrameOak is an educational site. It does not build, install, inspect, insure or lend. You can use the cost estimator for planning ranges, and the bid form passes your request to contractors who work in your area.

Get bids on this job

Describe the job in two short steps. FrameOak passes it to home improvement contractors and installers who work in your area; they set their own prices and terms and you decide whether to go ahead.

  1. 01 About the job.
  2. 02 Your contact details and consent.
  3. 03 A home improvement contractor or installer contacts you. Nothing is decided until you agree.

Step 1 of 2

About the job
Is it your house?

Leave it empty if you do not have one yet.

How soon?

FrameOak is not paid by you. The home improvement contractors and installers who contact you set their own prices and terms. How we make money.