Building a garage: what is in the scope and what the inspector looks at

A garage is a small building with its own foundation, a fire-rated wall if it is attached, and a floor with rules of its own. Know the parts before you compare bids.

By FrameOak Editorial Team Updated 8 min read

Priced by
Sq ft of footprint
What drives the price
Size, site, finishes
Permit
Yes; check locally
Who to hire
Licensed contractor
Illustration: a two-car garage under construction with a formed slab edge, framed walls and a wall section of drywall

In short

A new garage is a foundation and slab, framing and roof, a vehicle door, electrical work and, if it is attached, a fire-rated wall to the house. It needs a permit in most places, and inspectors usually look at the footing or slab before concrete is poured. Local rules set the footing depth, setbacks and wind rating for the door, so the numbers on this page are examples from named cities, not rules for your lot. Run planning ranges in the cost estimator.

What the job includes

Plan on these parts: site work and drainage, footings and slab, framing, roof, exterior finish, the vehicle door and opener, electrical, and for an attached garage the wall and door to the house. Contractors usually price the building by square foot of footprint and add items such as the door, wiring, extra windows and finish work. Each item should appear on its own line. See scope of work, line by line.

The price moves with the footprint, the wall height, the soil and slope, the foundation type your area calls for, the roof, the door and opener, electrical load, and how much grading or demolition the site needs. FrameOak shows no price table. Use the cost estimator for planning ranges. They are not bids.

The usual order is permit and plan review, site work and layout, footing and slab with the inspection before the pour, framing and roof, wall finishes and the vehicle door, electrical, and final inspection. The total time depends on the size, the weather, the permit office and the crew. Concrete needs time to cure before it carries loads, so ask the contractor for a written schedule that shows when each inspection falls.

Permit, zoning and inspections

In most places a new garage needs a building permit, and zoning rules set how close it can sit to a property line. City handouts show how the process works. St. Paul, Minnesota, lists these inspections for a detached garage: the footing and slab before concrete is poured, with forms and reinforcement in place; framing, with blocking, bracing, bolts and rough electrical; a fire-rated wall before sheathing and siding go on it, where one is required; and a final inspection after finish grade.

The same handout says a wall closer than 5 feet to an interior property line needs 1-hour fire-resistive construction, and openings are limited near the line. Spokane, Washington, requires engineered plans for pole garages and a separate electrical permit if power is run to one. These are local choices. Call your building department before you sign, and read building permits for major work.

Foundation and slab

The footing depth depends on local frost and soil conditions, so there is no single number. As one example, St. Paul's handout calls for a slab at least 3 1/2 inches thick with a perimeter 12 inches thick and 12 inches wide, poured at the same time, concrete of at least 3,500 psi, and anchor bolts at least 1/2 inch in diameter within 1 foot of each corner, at most 6 feet apart and embedded 7 inches. It also says concrete exposed to freezing or salt must be air-entrained.

Concrete is ordered by the cubic yard, so the math is worth knowing. As an invented example, a 24 by 24 foot slab is 576 square feet. At 3 1/2 inches that is 576 x 3.5 / 12 = 168 cubic feet, or about 6.22 cubic yards, before the thickened edge and waste. Each extra inch of thickness adds 48 cubic feet, about 1.78 cubic yards. Ask how the bid counts the edge and the waste.

If the garage is attached

The wall and ceiling between a garage and a house are a fire barrier, and the door in it has its own rules. The table shows examples from two handouts. Each is tied to a code edition and local amendments, so yours may differ.

Examples of attached-garage requirements, from the cited handouts
PartExample requirementSource
Wall and ceiling toward the houseAt least 1/2-inch gypsum board on the garage side. At least 5/8-inch Type X where a habitable room is above.MyBuildingPermit.com tip sheet, 2021 IRC with Washington amendments
Door to the houseSolid wood or steel at least 1 3/8 inches thick, or a 20-minute rated door. It must not open into a sleeping room.MyBuildingPermit.com tip sheet
DuctsAt least No. 26 gauge sheet steel, with no registers opening into the garage.MyBuildingPermit.com tip sheet
FloorNoncombustible, sloped so liquids run to a drain or toward the main entry door.City of Spokane checklist, 2015 IRC with Washington amendments
Automatic openerListed to UL 325.City of Spokane checklist

Some local rules add a self-closing device on the house door, and one county's handout says it is not required there. Ask which applies. Electrical and gas work in a garage is for a licensed professional and an inspector, and this page gives no instructions for it.

Signs of a bad job

Be careful if a contractor offers to start before the permit arrives, will not say who pours the slab, skips the footing inspection, or pours concrete without forms and reinforcement checked. A bid that says only "build garage" without the slab thickness, door, wiring and fire wall is not specific enough to compare. The bid check can help you spot gaps.

What to put in writing

  • Who pulls the permit, and which inspections come before concrete and before drywall?
  • What are the footing depth and slab thickness, and where do they come from, the code or the plan?
  • Is the plan drawn or stamped by an engineer, and who supplies truss drawings?
  • How will rain run off the slab and the roof, and where will it go?
  • For an attached garage, what is the fire barrier and the door to the house, and how will it be inspected?
  • What is the wind rating of the garage door, and what documents will I get?
  • What is the payment schedule, and what lien waivers will I receive?

Check your state's rules for contractors on our licensing page. A foundation that has already moved is a different job, covered in garage slab and foundation repair.

Sources

Facts on this page were last checked on November 20, 2026. The International Code Council's code text could not be opened in this check, so the code points come from the city, county and permit-portal handouts above, each tied to a named code edition and local amendments. St. Paul's handout and Spokane's checklist show no date. Your area may use a different edition and different numbers: check with your local building department. The slab size in the example is invented to show the arithmetic. FrameOak does not build or inspect garages.

Questions homeowners ask

Do I need a permit to build a garage?

In most places, yes. Zoning and building rules both apply. St. Paul's handout, for example, lists inspections of the footing and slab, framing and a final. Check with your local building department.

How thick should a garage slab be?

It depends on local code and on the plans for your site. One city's handout calls for at least 3 1/2 inches with a thicker perimeter. Treat that as an example, and ask your building department and the contractor what applies.

Does an attached garage need a fire-rated wall?

Under the International Residential Code, the wall and ceiling between a garage and the house use fire-rated gypsum board, and the door must meet a standard. Details vary by edition and by local change, so ask your building department.

Can I convert a garage later?

That is a separate project with its own permit and its own rules for the fire barrier, the floor and ventilation. Ask your building department before you plan around it.

Get bids on this job

Describe the job in two short steps. FrameOak passes it to home improvement contractors and installers who work in your area; they set their own prices and terms and you decide whether to go ahead.

  1. 01 About the job.
  2. 02 Your contact details and consent.
  3. 03 A home improvement contractor or installer contacts you. Nothing is decided until you agree.

Step 1 of 2

About the job
Is it your house?

Leave it empty if you do not have one yet.

How soon?

FrameOak is not paid by you. The home improvement contractors and installers who contact you set their own prices and terms. How we make money.